TKIN worked as property engineer for the development of the basic engineering of cogeneration installation for wood drying kiln with thermal oil boiler and OCR.
Technical data:
Installed thermal power 12 MW.
Location: Chile
Biogas cleaning for injection into the natural gas network
Projet description:
Development of the optimisation of the «UPGRADING» system with amine technology and commissioning of plant improvements in a pilot plant with a treatment capacity of 1003/h.
TKIN has also developed at the basic engineering level an UPGRADING plant, with a treatment capacity of 600 m3/h, using amine technology.