Slurry decontamination plant

Project description:

TKIN worked as property engineer for the development of the detail engineering of three CHP engine plants and redesign of the existing thermal installations.

Technical data:

  • Valladolid plant: Siemens cogeneration engines of 16 MW.
  • Huesca plant: 16 MW Jenbacher cogeneration engines.
  • Cataluña Plant: Jenbacher 16 MW cogeneration engines.

Compost refining line

Project description:

TKIN worked as the owner’s engineer for the development of the detailed engineering and subsequent turnkey construction of a compost refining line for automatic operation.

The line consists of the following processes:

  • Feeding system with pre-screening
  • De-forming system, to improve screening performance
  • Screening
  • Separation of undesirable materials from the product obtained (plastics and others)
  • Associated conveyor belt systems